Raw Earth Environmental was engaged to undertake a due diligence contamination and geotechnical assessment following the importation of soil from an unknown source at a proposed low-density residential development site. The assessment was critical in determining the suitability of the imported material for its intended use and ensuring compliance with environmental and planning regulations.
The site is planned for a Torrens Title subdivision, creating 17 residential lots with associated infrastructure, including public roads, drainage, and landscaping.
A due diligence assessment was conducted to evaluate potential contamination risks associated with historical land use, specifically:
Raw Earth implemented a targeted soil investigation in accordance with the NSW EPA Sampling Design Guidelines (2022). The assessment involved:
The investigation findings provided the client with confidence in the site's environmental and geotechnical suitability, ensuring compliance with regulatory requirements for residential redevelopment.